代码 · verified_hold
审核码:verified_hold; 官方关系:primary_paper_only_no_official_method_artifact_found; 最近核验:2026-08-14代码:not released; no official repository, installation, fixed commit or source license found
权重:not released; no JIT/ONNX policy file, model card or checksum found
数据:not released; no Isaac Sim environment, domain-randomization configuration, real rollout log, force trace, calibration data or task split found
许可证:not_disclosed;arXiv's article distribution license applies to the paper only; it does not grant reuse rights for the described training stack, policies, Dex3-1/G1 integration, logs or data.
依赖:Isaac Sim、PPO、asymmetric actor-critic、three decoupled policies、JIT/ONNX Runtime C++ inference
硬件/传感器:Unitree G1 with two Dex3-1 hands、onboard Jetson Orin NX、AMD 7950X and RTX 4090D reported for Isaac Sim training/evaluation
实机证据:The authors report Unitree G1 execution at 50 Hz with all three policies on an onboard Jetson Orin NX, without additional fine-tuning.;A 3.9–4 kg end-effector payload sequence and one cart configuration carrying six 18.8 kg water buckets (112.8 kg total cart payload) are documented; the push scenario commands 40 N and pull 35 N.;The paper does not report repetitions, success denominators, force-sensor calibration, abort/fall counts, variance, unplanned perturbations or independent physical replication.
独立复现:No qualifying independent fixed-version reproduction or public issue/deployment record was found.
限制/反面证据:Paper-only method; no source, policy, data, license or official project page;112.8 kg is a cart payload in one floor/setup condition, not a G1 carried-load specification or a certified force rating;Real-hardware trial denominator and success/failure statistics are absent;Forward/backward force control only; paper itself names expansion beyond this direction as future work;No independent reproduction or safety controller disclosure
当前建议:Unitree G1 力控 Loco-Manipulation 主流迭代·真机证据待复现;值得作为主动施力与分层全身控制的近期真机线索跟踪,但工程验证必须先要求固定环境、政策、力校准、控制频率、至少多次 push/pull 成功/失败分母与安全停止日志;在此之前不能采购式复用或进入已验证代码横评。
重点标签:人形全身控制、Unitree G1、力控制、工业负载操作、真机作者证据、主流技术迭代、待资源开放、待独立复现
核验来源:来源 1 · 来源 2
代码 · verified_hold
审核码:verified_hold; 官方关系:primary_paper_only_no_official_method_artifact_found; 最近核验:2026-08-14代码:not released; no official repository, installation, fixed commit or source license found
权重:not released; no JIT/ONNX policy file, model card or checksum found
数据:not released; no Isaac Sim environment, domain-randomization configuration, real rollout log, force trace, calibration data or task split found
许可证:not_disclosed;arXiv's article distribution license applies to the paper only; it does not grant reuse rights for the described training stack, policies, Dex3-1/G1 integration, logs or data.
依赖:Isaac Sim、PPO、asymmetric actor-critic、three decoupled policies、JIT/ONNX Runtime C++ inference
硬件/传感器:Unitree G1 with two Dex3-1 hands、onboard Jetson Orin NX、AMD 7950X and RTX 4090D reported for Isaac Sim training/evaluation
实机证据:The authors report Unitree G1 execution at 50 Hz with all three policies on an onboard Jetson Orin NX, without additional fine-tuning.;A 3.9–4 kg end-effector payload sequence and one cart configuration carrying six 18.8 kg water buckets (112.8 kg total cart payload) are documented; the push scenario commands 40 N and pull 35 N.;The paper does not report repetitions, success denominators, force-sensor calibration, abort/fall counts, variance, unplanned perturbations or independent physical replication.
独立复现:No qualifying independent fixed-version reproduction or public issue/deployment record was found.
限制/反面证据:Paper-only method; no source, policy, data, license or official project page;112.8 kg is a cart payload in one floor/setup condition, not a G1 carried-load specification or a certified force rating;Real-hardware trial denominator and success/failure statistics are absent;Forward/backward force control only; paper itself names expansion beyond this direction as future work;No independent reproduction or safety controller disclosure
当前建议:Unitree G1 力控 Loco-Manipulation 主流迭代·真机证据待复现;值得作为主动施力与分层全身控制的近期真机线索跟踪,但工程验证必须先要求固定环境、政策、力校准、控制频率、至少多次 push/pull 成功/失败分母与安全停止日志;在此之前不能采购式复用或进入已验证代码横评。
重点标签:人形全身控制、Unitree G1、力控制、工业负载操作、真机作者证据、主流技术迭代、待资源开放、待独立复现
核验来源:来源 1 · 来源 2